REFERENCE PROJECTS

EKOSERVIS SLOVENSKO s.r.o.
2024 - WWTP Lendak – WWTP Expansion
Mechanical-biological WWTP with two-stage treatment of sewage wastewater from the municipality of Lendak. The WWTP after expansion has a capacity of 4,125 PE.

2024 - WWTP Lusina
Reconstruction of the old reactor and modernization of the new reactor at the WWTP in Poland with a capacity of 10,000 PE.

2024 - WWTP Šuňava
Expansion of the capacity of the WWTP with membrane technology from the original 1,000 EO to 2,200 EO. The biological treatment process takes place in a biological reactor, from where wastewater is pumped into the membrane separation area. The treated wastewater flows from the membrane modules into the recipient.

2024 - Reconstruction and intensification of the Jamník WWTP
The existing WWTP was supplemented with a distribution facility, a pair of container WWTPs, a sludge tank and an electrical switchboard, which serves to control the entire WWTP.

2024 - WWTP Bumderice
Expansion of SBR reactor capacity, addition of aeration, solution of mechanical sludge dewatering and installation of an automatic septic tank station to improve the recording of the amount of imported water. Capacity was increased from 1,000 EO to 2,000 EO.

2023 - Žakovce WWTP
The Žakovce WWTP is implemented as a mechanical-biological one, where the subject of construction was the installation of mechanical sludge dewatering, which consists of a lamella dehydrator.

2023 - Tatranské Zruby WWTP
At the wastewater treatment plant , the pumping station and biological unit were renovated, with the aeration elements, blowers, air distribution systems, and electrical components being replaced.

2023 - Stráne pod Tatrami WWTP
The wastewater treatment plant in Stráne pod Tatrami was supplemented with mechanically scraped rakes and a sludge thickener. At the same time, the aeration system was completely reconstructed.

2023 - Svätý Kríž WWTP
Scraping rakes were installed at the wastewater treatment plant, pumps and aeration elements were replaced, and settling tanks and air distribution systems were also renovated.

2022 - Spišské Tomášovce, Village WWTP Reconstruction Project
Delivery and installation of machine-wiped rakes to the sewage pumping station. Number of connected equivalent residents: 834 PE

2022 - Veľká Lomnica - Thymos, WWTP Reconstruction Project
Delivery of mechanical pre-treatment upstream the wastewater treatment plant. Technological equipment of the WWTP tank + electrical part.

2022 - Holumnica - Village WWTP Reconstruction Project
Replacement of submersible pumps for raw sewage, including accessories, pipe connections, rake basket, electric winch, aeration elements for the pumping station.
Supply of new blowers, main air distribution with accessories.
Replacement of built-in settling tanks with equipment for settling tanks, delivery of new submersible mixers, replacement of aeration elements and air pipe distribution to the elements.
Delivery of a new submersible pump to the sludge tank, new aerating elements in the sludge tank and air piping to the elements.
Delivery of a new induction flow meter for measuring the flow on the discharge pipe from the pumping station.
The new control system of the mechanical technology line of the WWTP ensuring the control of machines and equipment.
Number of connected equivalent inhabitants: 800 PE

2022 - Košice, Double shell Pumping Station with technology
Delivery and installation of a double-shell rainwater pumping station, including the technological part and the electrical part.

2022 - Malá Domaša, WWTP Extension Project III. Stage + Pumping Station
Delivery and installation of a new biological reactor of the WWTP + pumping station for purified water.

2022 - BELL Zvolen, production and installation of large volume tanks

2022 - Ihľany Village WWTP Reconstruction Project II. Stage – technology extension
• PS 01 PUMPING CHAMBER, MECHANICAL PRE-TREATMENT
• PS 02 BIOLOGICAL TREATMENT AND DISTRIBUTION OF COMPRESSED AIR
• PS 03 BUILT-IN SETTLING TANK
• PS 04 SLUDGE MANAGEMENT
• PS 05 OPERATIONAL POWER DISTRIBUTION
• PS 06 INSTRUMENTATION
• PS 07 AUTOMATED TECHNOLOGICAL OPERATION CONTROL SYSTEM
Number of connected equivalent residents: 1200 PE